Archive for March, 2009

Upper bridge

Category | construction

Upper bridge

 

 

 

 

March 1st 2009 - Upper bridge of the tourbillon cage - the steel has been quenched and tempered

HEAT BABY HEAT !

Category | construction

February 28th 2009 - Heat-treatment LIVE (almost) of a steel bridge allowing us to modify the microstructure of the alloy.

Category | construction

Rotation bracket

 

 

 

 

February 27th 2009 - Rotation bracket of the tourbillon cage.

Category | construction

February 26th 2009 - Roll of seconds carriage

Category | construction

Minute Bridge

 

 

 

 

February 25th 2009 - Minute-bridge of the new C1 QuantumGravity

Guiding rail

Category | construction

February 24th 2009 - Guiding rail of the power-reserve

Aluminum Bridges

Category | construction

February 23rd 2009 - Aluminum bridges mimicking an integrated circuit.

Category | construction

February 23rd 2008- BNB did not slack up either! Most of the movment components have been machined - next stepts = prototyping.

The trials on micro-manufacturing, the mysterious glass elements are promising and the luminescent nanoparticules are terrific!

Category | construction
 
 
 

 

Multilayered dial    Multilayered dial    Multilayered dial

February 21st 2009 - They thought they had seen everything with the multi-layered skeletized Gravity dial… our dial workshop is pushing the limits one step further! Here are the first trials of one sandblasted part from a dial that does not look like a dial.

Hint:      Sputnik

Category | construction

February 19th 2009 - The Titanium insert of the bezel must be machined within extremely tight tolerances because it is then sent to a rubber processing company for overmolding.

This video was embedded using the YouTuber plugin by Roy Tanck. Adobe Flash Player is required to view the video.
 

 


{altattrib}