March 1st 2009 - Upper bridge of the tourbillon cage - the steel has been quenched and tempered
Tags: cage, quenched, tempered, upper bridge
This entry was posted on Sunday, March 22nd, 2009 at 9 h 00 min and is filed under construction. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.
Comments are closed.